A critical dimension | Mathematics homework help

Consider the situation described in Exercise 6.70. A critical dimension (measured in mm) is of interest to the process engineer. Suppose that five fixed positions are used on each wafer (position 1 is the center) and that two consecutive wafers are selected from each batch. The data that result from several batches are shown in Table 6E.32.

Connect with a professional writer in 5 simple steps

Please provide as many details about your writing struggle as possible

Academic level of your paper

Type of Paper

When is it due?

How many pages is this assigment?

(a) What can you say about overall process capability?

(b) Can you construct control charts that allow within wafer variability to be evaluated?

(c) What control charts would you establish to evaluate variability between wafers? Set up these charts and use them to draw conclusions about the process.

(d) What control charts would you use to evaluate lotto- lot variability? Set up these charts and use them to draw conclusions about lot-to-lot variability.

TABLE 6 E .32

Data for Exercise 6.71

 

 

Position

 

 

Position

Lot

Wafer

 

 

 

 

 

Lot

Wafer

 

 

 

 

 

Number

Number

1

2

3

4

5

Number

Number

1

2

3

4

5

1

1

2.15

2.13

2.08

2.12

2.10

11

1

2.15

2.13

2.14

2.09

2.08

 

2

2.13

2.10

2.04

2.08

2.05

 

2

2.11

2.13

2.10

2.14

2.10

2

1

2.02

2.01

2.06

2.05

2.08

12

1

2.03

2.06

2.05

2.01

2.00

 

2

2.03

2.09

2.07

2.06

2.04

 

2

2.04

2.08

2.03

2.10

2.07

3

1

2.13

2.12

2.10

2.11

2.08

13

1

2.05

2.03

2.05

2.09

2.08

 

2

2.03

2.08

2.03

2.09

2.07

 

2

2.08

2.01

2.03

2.04

2.10

4

1

2.04

2.01

2.10

2.11

2.09

14

1

2.08

2.04

2.05

2.01

2.08

 

2

2.07

2.14

2.12

2.08

2.09

 

2

2.09

2.11

2.06

2.04

2.05

5

1

2.16

2.17

2.13

2.18

2.10

15

1

2.14

2.13

2.10

2.10

2.08

 

2

2.17

2.13

2.10

2.09

2.13

 

2

2.13

2.10

2.09

2.13

2.15

6

1

2.04

2.06

1.97

2.10

2.08

16

1

2.06

2.08

2.05

2.03

2.09

 

2

2.03

2.10

2.05

2.07

2.04

 

2

2.03

2.01

1.99

2.06

2.05

7

1

2.04

2.02

2.01

2.00

2.05

17

1

2.05

2.03

2.08

2.01

2.04

 

2

2.06

2.04

2.03

2.08

2.10

 

2

2.06

2.05

2.03

2.05

2.00

8

1

2.13

2.10

2.10

2.15

2.13

18

1

2.03

2.08

2.04

2.00

2.03

 

2

2.10

2.09

2.13

2.14

2.11

 

2

2.04

2.03

2.05

2.01

2.04

9

1

1.95

2.03

2.08

2.07

2.08

19

1

2.16

2.13

2.10

2.13

2.12

 

2

2.01

2.03

2.06

2.05

2.04

 

2

2.13

2.15

2.18

2.19

2.13

10

1

2.04

2.08

2.09

2.10

2.01

20

1

2.06

2.03

2.04

2.09

2.10

 

2

2.06

2.04

2.07

2.04

2.01

 

2

2.01

1.98

2.05

2.08

2.06

 

Looking for a Similar Assignment? Let us take care of your classwork while you enjoy your free time! All papers are written from scratch and are 100% Original. Try us today! Use Code FREE20